Killurin Landfill

  • Contract Value: €3.2 Million
  • Contract Type: Design & Build
  • Client: Wexford County Council
  • Start/End: 2003 - 2010 (21 months over a 7 year period)
  • Company Involvement: The Killurin Landfill Site project was awarded to Roadbridge in 2003. Roadbridge also undertook the role of project Supervisor for the Construction Stage. A framework agreement was put in place where the works were carried out in a phased manner- Stages 1-5


View project PDF

This contract comprised the following: 69,750m³ of Excavation; 7,400 m³ waste Distribution; 13,500m³ Clay Engineered Berms; 26,250m³ Engineered Clay Cap; 26,000 m²Geogrid Stabilization Works; 17,500 m² GCL Liner to existing side slopes


Key Features

  • 31,000m² Erosion Protection mat
  • 42,500m² Fin Drain Membrane
  • 29,750m³ Sub-Soil Placement and 52,500m² Topsoil reinstatement
  • Working with and incorporating existing Landfill gas infrastructure into new works
  • Working with live waste facility