August 2020

Greenock Timelapse Video

A fantastic time lapse video from the Greenock Ocean Cruise Terminal Berth.

This project consisted of a 200m long floating pontoon. Designed to accommodate 340-metre-long cruise ships, the new pontoon comprises of four caissons, each weighing around 1,000 metric tonnes and made from steel-reinforced concrete filled with polystyrene to ensure buoyancy.

Well done to all involved!