Tarmac /Roadbridge JV (TRBJV) were employed by EKFB to deliver :-
Key Features
- Earthworks – Excavation, haulage and deposition of 153,000m3 of material to embankments and fill areas. Stabilisation of 103,000m2 of site won material to achieve CBR of 15% and 30% including the treatment of circa 28,000m3 of material for soft spots and floodplains. Installation of 10,000m3 of 6F5 and Type 1 for hard standings
- Drainage – Installation of pipe crossings, culverts, ponds including hybrid ponds, V-ditches, silt fencing, temporary flumes and kerbing
- Concrete – Installation of 13,000m3 of RCC utilising on-site mobile batchers. Installation of mesh reinforced breaks from highway, protection slabs, at grade crossings, headwall slabs and wingwalls
- Site Welfare establishment for all works
- All fencing