EKFB Site Access Road – Aylesbury Section

  • Project Type Rail
  • Client Eiffage Kier Ferrovial BAM Nuttall (EKFB) JV on behalf of HS2
  • Company Involvement Awarded as JV with Tarmac (TRBJV)
  • Form of Contract NEC3 Option B
  • Dates January 2021 - October 2021
  • Location Buckinghamshire, United Kingdom


Tarmac /Roadbridge JV (TRBJV) were employed by EKFB to deliver :-


Key Features

  • Earthworks – Excavation, haulage and deposition of 153,000m3 of material to embankments and fill areas. Stabilisation of 103,000m2 of site won material to achieve CBR of 15% and 30% including the treatment of circa 28,000m3 of material for soft spots and floodplains. Installation of 10,000m3 of 6F5 and Type 1 for hard standings
  • Drainage – Installation of pipe crossings, culverts, ponds including hybrid ponds, V-ditches, silt fencing, temporary flumes and kerbing
  • Concrete – Installation of 13,000m3 of RCC utilising on-site mobile batchers. Installation of mesh reinforced breaks from highway, protection slabs, at grade crossings, headwall slabs and wingwalls
  • Site Welfare establishment for all works
  • All fencing