The project consisted of the construction of 29.95km of motorway in Poland. The scope of works included:
Key Features
- 29.95km of new motorway
- 1,150,000 m3 of cut
- 1,805,000 m3 import
- 610,000 Tons Bituminous Macadam
- 17 no. bridge structures
- 992m precast box culverts (1.5 x 1.5m to 4.5 x 3m)
- 230m pipe culverts (800mm to 1200mm Ø)
- 21 no. Insitu Concrete Animal Passes (1.5 x 1.0m & 3.0 x 1.5m)
- 18 no. Precast Concrete Animal Passes (1.5 x 2.0m & 1.5 x 4.5m)
- 2 no. Motorway service area (MOP Lubien & MOP Strzelce)
- 2 no. Toll Plaza (SPO Kowal & SPO Sojki)
- 2 no. Interchanges
- Drainage system
- Utility diversions
- Environmental protection works including 67,000m2 of acoustic barrier 3m to 6.5m high
- Lighting, emergency telephones, motorway communications, Signing and Marking.