Back to projects overview

Ballycoolin to Cappagh Road Realignment Scheme

  • Project Type Roads / Bridges
  • Client Fingal County Council
  • Company Involvement Roadbridge was appointed as the Main Contractor for this project in June 2007 and Clinton Scannell Emerson & Associates acted as the Engineers.
  • Form of Contract IEI 3rd Edition Form of Contract
  • Dates July 2007 – September 2010
  • Location Co. Dublin, Ireland



Key Features

  • Re-alignment andfull reconstruction of 4km of single carriageway in 4 phases including construction of 5 no. new roundabouts with associated infrastructure & services
  • The majority of works were built online requiring extensive traffic management in an urban environment with an AADT of 14,500 for the Ballycoolin Road and 9,500 AADT for the Cappagh Road
  • Diversion of multiple existing services, including a 38inch concrete & a 24inch cast iron & a 24inch asbestos watermains, 450mm gas transmission main & blown fibre optic cables
  • Construction of 2.4km of 1000mm diameter ductile iron watermain & 4.0km of 400mm diameter ductile iron watermain
  • Extensive boundary treatments, fencing and safety barrier systems along both sides of the new road.