The Shanganagh Bray Main Drainage Scheme – Contract 2 – Storm Water Storage Tank and Transfer Pipeline involved the construction of a storm water storage tank and rising mains from Bray Pumping Station to Shanganagh Waste Water Treatment Works. The project was delivered on-time and within budget.
Key Features
- Laying approximately 4,600m of Ø 630mm OD, 380m of 900mm OD HPPE sewer rising main, 480m of concrete gravity pipeline in diameter 450mm-900mm nominal bore
- Construction of a 5,000m³ concrete storm storage tank including piling for foundations
- Crossing the DART Bray-Dublin Railway Line by no-dig methods
- Crossing foot bridge embankment with no-dig method with a 630mm nominal bore HPPE sewer rising main
- Precast manhole and other chambers, ancillary works and all associated fencing and landscaping works Traffic management