Bunnyconnellan Wind Farm
-
Project Type
Wind
-
Client
Aeolus Windfarms Ltd
-
Company Involvement
Main Contractor and PSCS for the works until end of turbine erection
-
Form of Contract
FIDIC Yellow (Design and Build)
-
Dates
October 2018 – October 2019
-
Location
Co. Mayo, Ireland
Key Features
- 12 no. Wind Turbine foundations (including piling works at 4 no. bases)
- 6.5km of new and upgraded access tracks
- Backfilling and reinstatement following construction of the turbine foundations
- 12 no. crane hardstanding areas
- Construction of site entrance and off-site public road works to facilitate turbine delivery
- Drainage works
- Cable trenching and ducting for wind farm collector network
- 950m of new grid connection works
- 1 no. met mast base for future met mast tower
- Widening of existing site culverts
- Maintaining access and coordinating with local residents with turbury rights to peat plots within the wind farm