Compound CSA Works PCV Expansion

  • Project Type Industrial / Commercial
  • Client Merck Sharp & Dohme
  • Company Involvement Roadbridge undertook the enabling works contract for the upgrade of Building 21 and contractor’s compound. DPS were the Designers and Clients Representatives on the project.
  • Form of Contract NEC 3
  • Dates July 2017 – December 2017
  • Location Co. Cork, Ireland



Key Features

  • Removal of existing gates and fencing. Installation of hoarding, paladin security fencing, turnstiles, barriers, gates and public lighting
  • Site clearance, modification of existing embankments, tree felling and excavation of approx. 25,000m2
  • Placing of Type 6F2 and Clause 804 over full extent of car park and contractor compound
  • Line marking, pedestrian crossings and signage
  • Maintain condition of existing ditch and stream running through site, installation of culverts at the north end
  • New macadam footpaths around the contractors compound connecting contractors compound with Building 21 and the carpark
  • Installation of foundations for modular cabins
  • Supply and install foundations and erect steel shed and smoking shelter
  • Excavation of trenches for all services and pop-ups to new modular cabins to include, LV, MV, Data, Public lighting, wastewater, foul waste
  • Installation of foul pumping station and rising main
  • Installation of first floor into Building 21 including, reinforcement, propping metal deck, concrete mix, pouring slab in sections, all joints, testing