The scope of works for this project includes Project and Construction Management, Installation Engineering, Procurement, Fabrication, Testing and Tie-in of the Onshore Gas Pipeline, Outfall Pipeline and Umbilicals.
Key Features
- Installation of 3.5km of the 20" Gas Pipeline, Outfall Pipeline, Umbilicals, and other Services from Corrib Gas Terminal to the Landfall Valve at Glengad
- Construction of the Tunneling Compound at Aughoose
- Provision of Tunneling Logistics to include delivery of Segments, Cement, Bentonite plus the disposal of Tunnel Arisings and Waste Water
- Environmental and Surface Water Management
- Reinstatement of Pipeline Wayleave and the environs at Gas Terminal