Creag Riabhach Wind Farm

  • Project Type Energy (Wind Farm)
  • Company Involvement Designer and Principal Contractor
  • Form of Contract FIDIC Yellow Book 2017
  • Dates August 2020 - September 2020
  • Location Lairg, Sutherland


The project entailed the design, supply, installation and commissioning of the civil and electrical works associated with the Creag Riabhach Wind Farm. There are two distinct sites; the main consented Wind Farm site and the 16.8km of road on the Dalnessie Estate and FLS track which will facilitate the AIL movements to site


Key Features

  • Site accommodation and facilities including temporary compound and storage areas, accommodation, secure storage compounds
  • 22no. wind turbine foundations including all site access and access roads, crane pads, turbine assembly and laydown areas, welfare/control building, and substation platform
  • Necessary upgrades and design and construction of Dalnessie Estate access road and FLS track
  • Design, supply, installation and commissioning of SCADA/FO cabling between turbines and the welfare and control building
  • Construction of new bridge at Vagastie