This contract comprised preparation of a 47km spread for a 610mm Ø 85 bar Gas pipe, excavation, backfill and reinstatement of the spread and other ancillary works, including modifications to the existing AGI’s along the route.
River Blackwater Crossing (140m in length) was done by micro-tunnel incorporating a vertical radius.
River Bride 930m, River Araglin 30m and River Dungorney 30m Crossings were also done by micro-tunnelling.
This project was delivered ahead of schedule and within budget.