Back to projects overview

Derrysallagh Wind Farm Civil Works

  • Project Type Wind
  • Client GE Capital (Derrysallagh Windfarm Ltd)
  • Company Involvement Main Contract was signed in May 2019
  • Form of Contract FIDIC Design and Build (Yellow Book)
  • Dates June 2019 – October 2019
  • Location Co. Sligo, Ireland



Key Features

  • The design, supply, erection and commissioning of the Wind Turbine Generators
  • Upgrade of existing entrance, compound area and 4km of existing access track upgrades
  • 2km of new access tracks for the wind farm
  • 10 no. new wind turbine bases, hard stands and crane assist platforms
  • Drainage, both permanent and temporary, throughout the site including water quality monitoring and environmental mitigation measures for surface water runoff
  • Managing the onsite borrow pit within an existing live quarry and the onsite logistics for movement of excavated material and deposition
  • Upgrade and route modification works along the public roads for the wind turbine supplier deliveries
  • Collector circuit cable ducting works between the new turbine locations and new substation
  • PSCS during the wind farm construction including turbine erection works