Derrysallagh Wind Farm Civil Works
-
Project Type
Wind
-
Client
GE Capital (Derrysallagh Windfarm Ltd)
-
Company Involvement
Main Contract was signed in May 2019
-
Form of Contract
FIDIC Design and Build (Yellow Book)
-
Dates
June 2019 – October 2019
-
Location
Co. Sligo, Ireland
Key Features
- The design, supply, erection and commissioning of the Wind Turbine Generators
- Upgrade of existing entrance, compound area and 4km of existing access track upgrades
- 2km of new access tracks for the wind farm
- 10 no. new wind turbine bases, hard stands and crane assist platforms
- Drainage, both permanent and temporary, throughout the site including water quality monitoring and environmental mitigation measures for surface water runoff
- Managing the onsite borrow pit within an existing live quarry and the onsite logistics for movement of excavated material and deposition
- Upgrade and route modification works along the public roads for the wind turbine supplier deliveries
- Collector circuit cable ducting works between the new turbine locations and new substation
- PSCS during the wind farm construction including turbine erection works