Design and Construction of Apron Slab Berth 26 & Berth 27

  • Project Type Marine
  • Client Dublin Port Company (DPC)
  • Company Involvement Works undertaken by Roadbridge as part of the Roadbridge Keating Joint Venture with design works by Malachy Walsh and Partners.
  • Form of Contract NEC3 Option B
  • Dates September 2017 – December 2017
  • Location Dublin Port, Ireland



Key Features

  • Water main and communication utilities
  • Drainage pipework, gullies and hydro block channels
  • Chambers, manholes and inspection boxes for services
  • Installation of subbase, blinding and concrete for 4,700m² yard slab with depths varying from 600mm deep to 900mm deep
  • Installation of all ironmongery to F900 loading
  • Design to cater for expected settlements in apron slab and also with traverse movements in adjoining quay wall