Dromada Wind farm

  • Project Type Wind
  • Client Airtricity
  • Company Involvement The Dromada Wind farm Project was awarded to Roadbridge in October 2008.
  • Form of Contract Design and Build
  • Dates October 2008 - February 2009
  • Location Co. Limerick, Ireland


The total power output for the farm is 28.5MW. The Wind farm is located close to the village of Athea, Co. Limerick


Key Features

  • 7.5km of Access Roads
  • Upgrade 2km of Public Road
  • Upgrade 5 no. Public Road Junctions
  • Construct 19 no. 1.5MW Turbine Bases
  • 19 no. Substation Bases
  • 1 no. Met Mast
  • Pour 5000m³ of concrete and fix
  • 750 tons of steel
  • Excavate 100,000m³of peat
  • Install 36km of Ducting
  • Drainage, road construction, accommodation
  • Works, fencing and other ancillary works