As part of the overall Wind Farm development Roadbridge managed the site investigation for 4 of the proposed wind farms to allow detailed design to be completed for the 69 turbines, substation and access roads.
Key Features
- PSCS for entire SI works
- Coordinating testing and SI with the clients designer
- Archaeological Monitoring
- Environmental Monitoring
- Providing Access within constraints of EIS and Coillte
- Site Investigation Works including:
66 No. Rotary Cores into Connemara Granite, 388 No. Trial Pits, 586 No. Dynamic Probes