Gas Pipeline to Great Island Power Station
-
Project Type
Gasline
-
Client
Board Gáis Networks
-
Company Involvement
The Gas Pipeline to Great Island project was awarded to SICIM/Roadbridge JV in September 2012. SICIM/Roadbridge undertook the role of Main Contractor and PSCS for the construction of the pipeline.
-
Form of Contract
IEI Civil Engineering Construction 3rd Edition with BGE Amendments
-
Dates
September 2012 - October 2013
-
Location
Co. Wexford, Ireland
Key Features
- Construction of 46km of 406.4mm OD Steel, to EN10208-2, Gas Pipeline
- Pipeline Design Pressure: 85 bar G
- 1075m Horizontal Directional Drill Crossing of the River Barrow
- Construction of 3 new Above Ground Installations (AGI's)
- 9 no. Trenchless Crossings including 2 railways, 4 rivers & 3 roads
- 34 no. road crossings
- Traffic management at road junctions
- Collaboration with all Local Authorities, Services Providers, and Landowners