Back to projects overview

Harestanes 132KV Cable Installation

  • Project Type Cable Installation
  • Client Scottish Power Renewables
  • Form of Contract Traditional
  • Dates September 2012 - April 2013
  • Location Scotland



Key Features

  • Excavate and Lay HDPE ducts for the cable and communication fibre optic systems from Moffat Substation to Harestanes Substation. » 7.5 km in Public Roads » 7.5 km on the Wind farm
  • Trench Consists of:
  • 3 no. 188mm HDPE Cable Ducts
  • 2 no. 49mm PVC Communication Ducts
  • 2 no. 103mm PVC ducts with 32mm Sub-Ducts
  • 3 no. / 2 no. 12mm Stock Boards
  • 2 no. strips of Warning Tape
  • Cement Based Sand surround
  • 1 no. 60m long - 400mm Ø Directional Drill under Motorway
  • 1 no. 60m long – 400mm Ø Directional Drill under Railway Line
  • 23 no. Special Engineering Designs (SED’s) i.e. crossing existing watercourses