Harestanes 132KV Cable Installation
-
Project Type
Cable Installation
-
Client
Scottish Power Renewables
-
Form of Contract
Traditional
-
Dates
September 2012 - April 2013
-
Location
Scotland
Key Features
- Excavate and Lay HDPE ducts for the cable and communication fibre optic systems from Moffat Substation to Harestanes Substation.
» 7.5 km in Public Roads
» 7.5 km on the Wind farm
- Trench Consists of:
- 3 no. 188mm HDPE Cable Ducts
- 2 no. 49mm PVC Communication Ducts
- 2 no. 103mm PVC ducts with 32mm Sub-Ducts
- 3 no. / 2 no. 12mm Stock Boards
- 2 no. strips of Warning Tape
- Cement Based Sand surround
- 1 no. 60m long - 400mm Ø Directional Drill under Motorway
- 1 no. 60m long – 400mm Ø Directional Drill under Railway Line
- 23 no. Special Engineering Designs (SED’s) i.e. crossing existing watercourses