Killurin Landfill

  • Project Type Industrial / Commercial
  • Client Wexford County Council
  • Company Involvement The Killurin Landfill Site project was awarded to Roadbridge in 2003. Roadbridge also undertook the role of project Supervisor for the Construction Stage. A framework agreement was put in place where the works were carried out in a phases (Stages 1-5)
  • Form of Contract Design & Construct
  • Dates 2003 - 2010, 21 months over a 7 year period
  • Location Co. Wexford, Ireland
  • Value €3.2 Million


View project PDF

Key Features

  • 69,750m³ of Excavation
  • 7,400 m³ waste Distribution
  • 13,500m³ Clay Engineered Berms
  • 26,250m³ Engineered Clay Cap
  • 26,000 m² Geogrid Stabilization Works
  • 17,500 m² GCL Liner to existing side slopes
  • 31,000m² Erosion Protection mat
  • 42,500m² Fin Drain Membrane
  • 29,750m³ Sub-Soil Placement
  • 52,500m² Topsoil reinstatement
  • Working with and incorporating existing Landfill gas infrastructure into new works
  • Working with live waste facility