New Linkspan no 6 : Dublin Port

  • Contract Type NEC3 Option B
  • Client Dublin Port Company (DPC)
  • Company Involvement Design manufacture, supply, installation and commissioning of one linkspan at Alexandra Basin West Berth 31&32. Works undertaken by the Roadbridge and L&M Keating Joint Venture utilizing design by Ravestein BV (Netherlands)
  • Start / End Dates 20 Feb 2017 – 11 Nov 2017
  • Contract Value €4.43 Million


View project PDF

The works comprise all activities and operations necessary for the steelwork fabrication for the new Linkspan.

Also included was detailed coordination with Port Technical Advisors, Harbour Master and contractors to coordinate, deliver, test and commission the Linkspan and also the delivery of the final documentation and certificates, for the Linkspan.

The extent of the work includes:


Key Features

  • Workshop drawings.
  • Material pre-treatment.
  • Steel purchase and delivery (with weld primer).
  • Fabrication of the steelwork for the new Linkspan.
  • Protective treatment of the steel structure.
  • NDT-inspection of the steelwork.
  • Transport from the Netherlands to site and installation on site.