Oweninny Wind Farm Phase 1 Visitor Centre and O&M Building

  • Project Type Industrial / Commercial
  • Client Oweninny Power DAC
  • Company Involvement Roadbridge completed the Design and Build Contract for the Operations and Maintenance Building for Oweninny WF Phase 1 and also the Visitor Centre which will display elements of the windfarm and also the former Bellacorick Peat Production Plant which the site was original used for.
  • Form of Contract Design & Build Contract
  • Dates June 2018 – June 2020
  • Location Co. Mayo, Ireland.



Key Features

  • The design and construction of the Oweninny Wind Farm Phase 1 Visitor centre and Operations and maintenance Building on the existing site of the Oweninny Wind Farm Phase 1 Civil Works.
  • This includes the construction of the O&M building compound and Visitor centre car and coach parking, surface water and foul drainage systems to designated terminal points, service connections from designated terminal points, connections to existing access tracks, Landscaping and other minor works.