Back to projects overview

Takeda Ireland Infrastructure Project

  • Project Type Industrial / Commercial
  • Client Takeda Ireland Ltd.(Construction works managed by PM Group)
  • Company Involvement Takeda Ireland Infrastructure Project was awarded to Roadbridge in October 2018
  • Form of Contract RIAI Remeasurable Contract
  • Dates September 2017 – February 2019
  • Location Dublin, Ireland



Key Features

  • Site Clearance, Demolition and Earthworks
  • Construction of Reinforced Concrete Structures: MV & LV Electrical Switchroom, Transformer Bunds / Plinths, Diesel Tank Bund, Generator Trenches / Plinths, 40m long Diesel Fuel supply Trench, Generator Bases
  • Infrastructure project built to provide a backup power supply to the Ninlaro and Tigress facilities
  • Installation of Electrical and Comms. Ducting and Chambers and earthing
  • Surface water and Foul water drainage
  • Access Roads, Paved Areas and Hardstanding’s
  • Kerbing, Footpaths, Steps and Handrails
  • Perimeter Palisade Fencing
  • Hard & Soft Landscaping