Terminal 4 & Revetment Removal
-
Project Type
Marine
-
Client
Dublin Port Company
-
Company Involvement
Works undertaken by Roadbridge as part of the Roadbridge Keating Joint Venture
-
Form of Contract
NEC 3 Option B – Client Design
-
Dates
April 2018 – September 2019
-
Location
Dublin Port, Ireland
Key Features
- Excavation, processing and classification of 108,000m³ waste material from revetment and export to licenced facilities
- General site clearance, reducing areas identified for resurfacing to formation level
- Installation of new surface water networks and manholes throughout the site
- Installation of 2 no. attenuation facilities
- Installation of class 1 full retention separator to manage local spills and silt contamination
- Installation of new power/communication ducts and chambers throughout the site
- Installation of water supply main with associated hydrants and sluice valves.
- Installation of new concrete pavement 20,000m²and flexible pavement 19,500m²
- Installation of security fencing, walls and gates
- Installation of 30m high mast lighting towers, 12m high perimeter lighting columns and CCTV columns up to 18m high