Tralog Windfarm Connection Cable & Install

  • Project Type Duct & Cable Installation
  • Client Scottish Power Energy Networks (SPEN)
  • Company Involvement Installation, testing and commissioning of cable route
  • Form of Contract NEC3 Option B (with amendments)
  • Dates November 2019 - July 2020
  • Location South Ayrshire, Scotland



Key Features

  • Installation of 3 no. 160mm ducts and 1 no. 110mm duct for approximately 5.6km
  • 1 no. Horizontal directional drill under the River Muck for approximately 100m
  • Installation of 3 no. 33kv cables for 5.6km
  • Excavation and subsequent reinstatement of 11 no. HV jointing bays
  • 33 no. straight single core joints
  • 3 no. indoor cable terminations
  • 6 no. outdoor cable terminations
  • Installation of 5.6km of 36f fibre-optic cable including 8 no. fibre joints and termination onto the optical distribution frame and rack at each respective end
  • Final Testing and commissioning works, including HV pressure testing, cable sheath testing and OTDR testing