Whitewater Shopping Centre
-
Project Type
Industrial / Commercial
-
Client
Ballymore Group
-
Company Involvement
Roadbridge was main contractor for the enabling works contract which was undertaken separately to the main build. Roadbridge also undertook the role of PSCS for this Contract.
-
Form of Contract
FIDIC Design Build
-
Dates
January 2004 - July 2004
-
Location
Co. Kildare, Ireland
Key Features
- 15,000m³ concrete including slabs and foundation beams
- 700m long 3m high retaining wall
- 2,500 tonnes of steel
- 3.5 km of pipework of various sizes
- Sheet-piled boundary wall adjacent to the existing town centre road network (approx. 3.5m under street level) – access to local businesses required to be maintained
- 120,000m³ bulk cut